Check Box for These Contents
In the event of missing or defective parts please call our customer service
dept. at
1 800 282 9346, ext #20
(Mon. to Fri. 8:00 AM to 4:00 PM EST).
1.
Arched Top Rail
(1)
2.
P
ost Caps (2)
3.
P
osts (2)
4.
Vertical Spindle Left
(1)
5.
Vertical Spindle Right
(1)
6.
Horizontal Spindles
(4)
7.
Diamonds
(2)
8.
Bottom Rail
(1)
9. Ground Anchoring Stakes (2)
10. 5/8” Self-Auguring Stainless Steel Screws (12)
Tools You Will Need
• Cordless Drill
• Hammer
• Tape Measure
• Level
• Shovel
General Information
• Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 5’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
The Milan Trellis
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
www.edenarbors.com
1
2
10
Not to Scale
8
59.26
4
27.27
55.26
20
3
4
5
6
7
9
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Ver 1/Nov 2008
Comentarios a estos manuales