Check Box for These Contents In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346, ext #20 (Mon. to Fri
STEP O NE2Insert one steel stiffener (with steel block facing up) into the lower pocket of the beam past the joiner. Push untilsteel block hits the i
ST EP T W O3Lay out the two carrying beams as illustrated with pre-drilled holes facing up. Position the eight rafters over the respective predril
ST EP T W O4The Faireld Grande ArborST EP F OU RSet out one post and complete the side panel by insertingthe side panel assembly into the holes on
ST EP S IXMove side panels to their final location and adjust the openingwidth to 80 in. (203.2 cm.). Place the pre-assembled arbor top onto the post
Move the arbor to its final location (you will need a helper).When you have identified the location of each post, mark the positions of the ground and
Comentarios a estos manuales